New Construction Fee
Permit based on cost of construction including labor & materials in accordance with the ICC National Average Calculations
- permit good for 6 months
 $8.50 minimum fee plus $4.25 per $1,000 of construction
 Temporary Construction Water - permit good for 9 months  $75  (additional 6 months construction water -- $100)
 Water Tap Fee  $200 per tap
 Sewer Tap Fee  $100 per tap

Storm water Development Charge

 $.06 per square foot of covered ground (see attachment for more details)
 Water Meters
5/8" Orion Meter Set  $241.04 w/ tax
3/4" Orion Meter Set  $273.22 w/ tax
1" Orion Meter Set  $371.86 w/ tax
1 1/2" Orion Meter Set   $673.99 w/ tax
2" Orion Meter Set w/ cast   $890.31 w/ tax
2" Orion Meter Set w/ brass $1,140.60 w/ tax
3" Compound Set w/ cast  $2,666.17 w/ tax
3" Compound Set w/ brass $2,952.21 w/ tax
4" Compound Set w/ cast $4,072.55 w/ tax
4" Compound Set w/ brass $4,513.54 w/ tax
Meter sizes larger than 2" are special orders and need to be ordered through the Finance Department.  The customer will be charged a $25.00 freight charge for the meter. Allow at least 15 Working days for delivery
Remodeling
 Permit fee based on the estimated cost of construction, including labor & materials.  $6.50 minimum fee, plus $3.75 per $1,000


Electrical  $6.50


Gas   $23.00


Demolition
 Residential $50.00
 Detached garage or accessory building $40.00
 Commercial - based on construction cost (including labor & materials) $50.00 minimum fee, or $4.25 per $1,000 of construction